Humanz Logo
Solutions
Workforce Management
Rostering & Scheduling
Fatigue Management
Subcontractor Management
Timesheet Software
Mining & Resources
Civil & Construction
Labour Hire
Pricing
Approach
Resources
Articles
Tools
Glossary
FAQs
Videos
Integrations
About
Contact
Humanz App Google Play DownloadHumanz App Store Download
← All FAQ topics

Safety Systems & Forms FAQs

109 questions and answers on safety systems & forms for Australian field teams. Each answer stands on its own and links to the guide that covers it in full.

What is a confined space entry permit?

A confined space entry permit is a written authorisation, completed by a competent person, that a business must issue before directing a worker into a confined space. Under the model WHS Regulations it must state the space, the names of the people permitted to enter, the period of the work and the risk control measures, and include a space to acknowledge that the work is complete and everyone has left. It is the one work permit that Australian WHS law names.

When is a confined space entry permit required?

A permit is required whenever a business directs a worker to enter a confined space to carry out work, under regulation 67 of the model WHS Regulations and under Victoria's own OHS Regulations. The only exception in the model regulations is for emergency service workers entering to rescue someone or give first aid. The permit covers one space, named entrants and a set period, so a new space, new entrants or a new period needs a new permit.

What must a confined space entry permit include?

At minimum it must name the confined space, the people permitted to enter, the period of the work and the measures to control risk based on the written risk assessment, with a section for the competent person to acknowledge that the work is finished and all workers have left. Most permits also record the atmosphere test results with time and tester, the isolations, the standby person, the communication method, the rescue arrangements and an entry and exit log.

What does the standby person do in confined space entry?

The standby person stays near the entry for the whole entry, keeps continuous communication with the workers inside, monitors conditions and watches the work where practicable. If something goes wrong they raise the alarm and start the rescue procedure from outside. SafeWork NSW says the standby person must never enter the space to attempt a rescue, because would-be rescuers are often the second and third victims.

What are the safe atmosphere limits for confined space entry?

The model WHS Regulations require a safe oxygen level, with air supplied respiratory equipment where oxygen is below 19.5 percent and a safe level is not reasonably practicable, and they ban purging with oxygen above 21 percent. Flammable gas must be below 5 percent of its lower explosive limit; between 5 and 10 percent workers are removed unless a calibrated continuous-monitoring detector is used, and at 10 percent or more they are removed immediately.

How long do you keep a confined space entry permit?

Under the model WHS Regulations the permit is kept at least until the work it covers is completed, and the risk assessment for at least 28 days after the work finishes. If a notifiable incident occurs in connection with the work, both are kept for at least two years after the incident, and training records are kept for two years. Many businesses keep permits much longer, because they answer who was in the space and who authorised it.

Who can issue a confined space entry permit?

Under the model WHS Regulations the permit must be completed by a competent person, meaning someone with the knowledge and skills to assess the space, its hazards and the controls, and it must be in writing. Most sites authorise named permit issuers who have confined space training, are not entrants on that job, and inspect the space and its isolations in person before signing. On a site run by a principal contractor, the principal's permit system and issuers normally apply to every subcontractor.

What is a hot work permit?

A hot work permit is a written authorisation for welding, cutting, grinding, brazing or any other work that produces heat, flame or sparks where something within range could burn or explode. It records the job, location and period, the fire hazards found and the controls applied, any gas tests and isolations, and the named fire watch. It is signed by the issuer, the person in charge of the work and the fire watch before work starts, and closed only when the area is confirmed cold.

What does a fire watch do during hot work?

A fire watch is a named person with an extinguisher at hand whose only job during hot work is to watch where sparks and heat land, including behind, below and through gaps, and to deal with any fire immediately. After the work stops, the fire watch stays for the period the site's permit sets and checks for smouldering material before the permit is closed. Regulators in Western Australia, New South Wales and Victoria all call for a fire watch and a post-work check for smouldering.

How far do combustibles need to be cleared for hot work?

It depends on the site's permit system and the conditions, but WorkSafe WA's hot work guidance asks for fire hazards within 15 metres of the hot work to be controlled. SafeWork SA asks for a 10-metre cleared space for outdoor grinding in the fire danger season. Combustibles inside the radius are removed, covered with fire blankets or wetted down, and the permit should state the radius it uses.

Can you weld or cut a drum that held fuel?

Only after it has been fully decontaminated and certified gas-free by a competent person, and WorkSafe Victoria's advice is to eliminate hot work on drums and tanks wherever possible. Rinsing with water does not guarantee that residue or vapour is gone. Before any hot work on a container that held flammables, the atmosphere is tested and work proceeds only if flammable gas or vapour is below 5 percent of its lower explosive limit.

Who can issue a hot work permit?

A hot work permit is issued by a person the site's permit system authorises, usually a supervisor or permit officer trained in that system who is not doing the work and who has inspected the job in person. On a site run by a principal contractor, the principal's permit system and issuers normally apply to every subcontractor. Most sites keep a list of authorised issuers and a register of every permit issued.

Is hot work allowed on a Total Fire Ban day?

In Victoria, the CFA says welding, grinding and other hot work that creates heat and sparks is banned outdoors on Total Fire Ban days. Other states and territories set their own fire danger rules, which can restrict or ban outdoor hot work, sometimes with permit or exemption arrangements. Check the fire service rules for the location before any outdoor hot work in the fire danger season.

What details go on an incident report form?

An incident report form should record who was involved, when and where it happened, the sequence of events, injuries and treatment, witnesses, immediate actions, photos and follow-up controls. It should also ask what could reasonably have happened, not only what did. Make the questions on injuries, treatment and whether anyone was exposed to a serious risk mandatory, because together they show whether the incident may need to be notified.

What counts as a notifiable incident?

A notifiable incident is the death of a person, a serious injury or illness, or a dangerous incident arising out of the conduct of a business or undertaking. Under the model WHS laws, serious injuries include those needing immediate treatment as a hospital in-patient, or immediate treatment for injuries such as an amputation. A dangerous incident is notifiable even if no one is injured, and the exact categories differ between states and territories, so check with the regulator where the work happens.

How quickly must a notifiable incident be reported?

A notifiable incident must be reported to the regulator immediately after the business becomes aware of it, by the fastest possible means. Under the model WHS laws, notice can be given by phone or in writing, and if the regulator asks for a written notice after a phone call, it must be given within 48 hours. In Victoria, a written record must go to WorkSafe within 48 hours every time, whether or not WorkSafe asks.

What is a notifiable incident in Queensland?

In Queensland a notifiable incident is a death, a serious injury or illness, or a dangerous incident arising out of the business, the same three categories as the model WHS Act, plus a serious electrical incident or dangerous electrical event under the state's electrical safety laws. Notify Workplace Health and Safety Queensland immediately on 1300 362 128 or through its online form, and if you notify by phone no written notice is required. Mines notify Resources Safety and Health Queensland on 1300 312 339 instead.

What is a notifiable incident in NSW?

In NSW a notifiable incident is the death of a person, a serious injury or illness, or a dangerous incident, and SafeWork NSW must be told immediately on 13 10 50, 24 hours a day. Failing to notify carries a maximum penalty of $50,000 for a body corporate and $10,000 for an individual, and the scene must be left undisturbed until an inspector arrives or gives a direction. You must also tell your workers compensation insurer within 48 hours, and mines notify the NSW Resources Regulator on 1300 814 609.

Who do you notify about a workplace incident in each state?

The WHS regulator where the work happens, never Safe Work Australia, which takes no notifications. The incident lines on each regulator's own page as at September 2026 are SafeWork NSW 13 10 50, Workplace Health and Safety Queensland 1300 362 128, WorkSafe Victoria 13 23 60, WorkSafe WA 1800 678 198, SafeWork SA 1800 777 209 for a death or life-threatening injury, WorkSafe Tasmania 1300 366 322, WorkSafe ACT 13 22 81 and NT WorkSafe 1800 019 115. Mines in NSW, Queensland and WA have their own mines regulator or portal on top.

What is the difference between a hazard report and a near-miss report?

A hazard report records a condition that could cause harm before anything has happened, while a near-miss report records an event that could have hurt someone but didn't. A missing handrail is a hazard, and a load landing where someone stood a minute earlier is a near miss.

Is a near miss a notifiable incident?

Sometimes. A near miss is notifiable under WHS laws when it counts as a dangerous incident, meaning it exposed someone to a serious risk from hazards such as a collapsing excavation or something falling from height. In Victoria, WorkSafe gives a near miss as its example of an incident that exposes a person to serious risk.

How long must notifiable incident records be kept?

Records of each notifiable incident must be kept for at least five years from the day notice was given to the regulator, under section 38 of the WHS Act. WorkSafe Victoria also says to keep a copy of the written notification for at least five years.

Can anything be moved at an incident site before an inspector arrives?

Yes, but only for a few reasons, and the list depends on where the work is. Under the model WHS laws you can help an injured person, remove a deceased person, do what's essential to make the site safe or minimise the risk of another notifiable incident, take action associated with a police investigation, or act with an inspector's or the regulator's permission. Victoria's OHS Act allows the site to be disturbed only to protect someone's health or safety, help an injured person, or take essential action to make it safe or prevent another incident. Otherwise leave the site undisturbed until an inspector arrives or directs otherwise, and in the ACT preserve evidence such as digital records and witness details too.

What is a journey management plan?

A journey management plan is a written plan for a work-related drive that carries enough risk to need one, covering the driver and vehicle, the route and stops, departure and planned arrival times, the check-in schedule, the named person monitoring the journey, and what that person does if a check-in is missed. It usually includes a fatigue check before departure and trip-specific hazards with a control for each.

What should a journey management plan include?

A journey management plan should include the driver, any passengers and the vehicle with its registration and prestart check, the route from, to and via with road types, departure time, realistic driving time and planned arrival, and the planned rest stops. It also needs the check-in schedule and method, the named monitor and a backup, the escalation rule for a missed check-in, the communications carried, a fatigue check before departure, the trip's specific hazards with a control for each, and approval and arrival sign-offs.

When is a journey management plan required?

A journey management plan is required whenever the business's own procedure says it is, because no Australian regulation sets a trigger. Common triggers are a drive past a distance or time threshold the business sets, remote or unsealed roads, night driving, driving after a shift or at the end of a swing, DIDO commutes, routes with no phone coverage, passengers or a hazardous load, and heavy vehicle journeys.

What happens if a driver misses a check-in?

The monitor starts the escalation rule written on the plan at the due time, not when someone notices. A typical rule rings the driver on every channel a set number of minutes past the due time, then the destination and the last known stop, then notifies the supervisor and starts the search procedure with the last known location, the vehicle registration and the time of the last contact, logging every step.

Who monitors a journey management plan?

A named monitor does, usually a supervisor, site office or control room worker who is on shift for the whole journey plus the escalation window, with a backup named on the plan. The monitor receives each check-in, records every one received or missed, and starts the escalation rule at the time written on the plan rather than when someone notices. A plan whose monitor is on leave or asleep gives the driver no protection.

How is a journey management plan different from a lone worker check-in?

A journey management plan is a lone worker check-in procedure applied to a drive, with the extra parts a vehicle needs. Both name a monitor, set check-in times and write down an escalation rule for a missed contact; the journey plan adds the route and stops, the vehicle and its pre-start check, the communications carried for the coverage along the way, a fatigue check before departure, road hazards and an arrival sign-off, and it still applies when the vehicle has four people in it.

What is a JSA template?

A JSA template is a blank job safety analysis form laid out so a crew can break one task into steps, list the hazards at each step, rate the risk, record the controls and who is responsible for them, and sign on before starting. Good templates add a review row for when conditions change and a drop-down for the hierarchy of control, so PPE is visibly the last resort. The Humanz JSA template is a free Excel workbook with all of that plus an example risk matrix.

What is the difference between a JSA and a SWMS?

A SWMS is the document the law requires before high risk construction work starts, while a JSA is a planning tool for any task that no regulation requires by name. A JSA often sits under a SWMS to cover the day's detail, but it cannot replace one for work on the high risk construction work list, such as a fall risk over 2 metres, a trench deeper than 1.5 metres, energised electrical services or moving mobile plant.

What is a Take 5 in safety?

A Take 5 is a quick personal risk check a worker does in the minutes before starting a task. It usually runs through five steps: stop and think, look and identify, assess the risk, control the hazards, and proceed only if safe. There is no regulator definition and no official version, so the wording varies by company, and it is a site or company requirement rather than a legal document.

What should a Take 5 checklist include?

A Take 5 checklist should capture who, where, what and when, then walk the worker through stopping, looking at the actual work area, identifying hazards, confirming each control is in place, and deciding whether the task can be done safely. A short list of common hazard categories helps people remember the ones they overlook, such as heat, lone work and the environment. The most useful addition is a question about what has changed since last time, with a clear instruction that a No means stop and talk to the supervisor.

Who fills in a JSA?

The supervisor usually leads it, with the workers who will do the task contributing the steps and hazards, because they know how the job really goes. Everyone doing the task then signs on to show they have been walked through the controls. A JSA written by someone who will not be on the job, and signed by people who have not read it, has the form of a JSA without the substance.

How long should a JSA be kept?

No regulation sets a retention period for a JSA, because no regulation requires the form by name. A practical yardstick is the rule the model WHS Regulations apply to a SWMS: keep it until the work it covers is finished, and for at least two years if a notifiable incident happens in connection with that work. Many businesses simply keep every completed JSA with the job record, which is easy once the forms are digital and tied to the job.

What does JSA mean in safety?

JSA stands for job safety analysis. It's a short written breakdown of a task into its steps, the hazards at each step and the controls that make each step safe, done before the work starts. Some sites call it a JHA (job hazard analysis) or a JSEA.

Do you need both a JSA and a SWMS?

Often, yes, on a construction site. The SWMS is mandatory for the listed high risk construction work and sets out the method, while a JSA is optional and plans one task on the day, including the detail the SWMS doesn't carry. Many principal contractors ask for both, so check the site rules before the crew starts.

When is a SWMS required?

A SWMS is required before any high risk construction work starts. The model WHS Regulations list 18 categories, including a risk of falling more than 2 metres, trenches deeper than 1.5 metres and work near energised electrical services. Victoria lists 19 types, and since 17 July 2026 the Northern Territory has used 3 metres rather than 2 on residential construction sites, so check with the regulator where the work happens.

Can a SWMS or JSA be kept on a phone?

Yes. NT WorkSafe's guidance confirms a SWMS can be kept electronically, and because a JSA or Take 5 isn't a legal form, nothing ties either to paper. What matters is that the workers doing the job can get to the SWMS and understand it, and that it's available for inspection for as long as it must be kept.

What is lockout tagout?

Lockout tagout is a procedure for isolating plant from all its energy sources before maintenance, cleaning or repair, and locking the isolation points so the plant cannot be restarted while people work on it. Each worker fits a personal lock and danger tag, stored energy is released, and the isolation is tested by trying to restart the plant. In Australia it is usually just called isolation.

What is the difference between lockout and tagout?

Lockout puts a padlock on the isolation point so the plant physically cannot be re-energised, while tagout attaches a tag telling others who is working on the plant and why. Australia's model codes of practice say a tag on its own is not an isolation, because only a lock is effective at isolating the energy source.

What is the difference between isolation and lockout?

Isolation disconnects plant from its energy sources at the isolation point, and lockout secures that isolation with a padlock so nobody can undo it while work is under way. Isolation is the whole procedure, from identifying the energy sources to testing that the plant cannot start, and lockout is one step inside it. An isolator switched off but not locked can be switched back on by anyone who walks past.

Who can remove a personal danger lock?

Only the person who fitted it, as a rule. The electrical code of practice says danger tags should only be removed by their signatories, and regulator guidance allows a supervisor to remove one only after consulting that person or under a management-approved procedure. If the owner cannot return, the site must manage the risk first, normally by confirming they are off site and checking nobody is in or on the plant.

What is a group isolation lockbox?

A group isolation lockbox lets a large crew share one set of isolation locks. An authorised isolator locks every isolation point and puts the keys in a box, then each worker fits their own personal lock to the box, so the keys cannot come out until every worker has removed their lock. The plant code of practice describes the method and says there should be no duplicate keys except a master key kept secure for emergencies.

What is an out of service tag?

An out of service tag marks equipment that is faulty, damaged or unsafe and must not be used until it is repaired. It is fixed to the equipment's operating control or power isolator and states the reason the equipment is out of service. Under the electrical code of practice it should only be removed by a competent person once the defect is fixed, and it is a warning about the equipment, not a personal isolation protecting someone working on it.

What is a lone worker check-in?

A lone worker check-in is a scheduled contact between a worker who is out of sight and earshot of others and a named person responsible for noticing if the contact does not arrive. It usually runs as a check-in at the start of the shift, contacts at set intervals or at each change of location, and a sign-off at the end, with a written escalation procedure for a missed contact.

How often should a lone worker check in?

No Australian law sets an interval, so it comes from the risk assessment. A common approach is start and sign-off only for low-risk daytime work with mobile coverage, a contact every two hours or at each change of location for moderate risk (alone for more than a couple of hours, or after hours, with coverage), and hourly contact or a monitored device with automatic alerts for remote, night-time, no-coverage or high-risk work. WorkSafe Victoria's farm guidance gives a two-hourly call or text as an example, not a rule.

What should a working alone procedure include?

A working alone procedure should define who counts as alone, require a risk assessment covering location, time of day, duration, the task, communication coverage and the person, and set the check-in interval and method for each risk band. It should name the receiver and a backup, require a start-of-shift contact with location and expected finish, set out a timed escalation ladder for a missed check-in, require an end-of-shift sign-off, and keep a record of every contact and escalation.

What happens if a lone worker misses a check-in?

The receiver starts the escalation ladder at the due time, not when someone notices. A typical ladder rings the worker on every available channel at ten minutes past the due time, then the nominated contact or the site, then sends the nearest person, and calls 000 with the last known location at 45 to 60 minutes, sooner for high-risk work. Each step is logged with the time and the person who took it.

Does a mobile phone count as a communication system for remote work?

Only where it has reception. WorkSafe WA lists mobile phones with reception among acceptable communication systems, alongside personal duress alarms, two-way radios, satellite phones and personal locator beacons. In areas without coverage the system has to be a radio, a satellite device or a beacon, and a phone app on its own does not meet the duty.

Do I need a lone worker app or is a check-in procedure enough?

The procedure is always needed, and an app is one way of running it, so whether you need one depends on the risk band. For low-risk daytime work with mobile coverage, a start-of-shift contact and an end-of-shift sign-off recorded against the job is usually all the risk assessment asks for. For moderate risk, an app with timed check-ins and automatic escalation is more reliable than a supervisor remembering to ring, and for remote, night-time or no-coverage work the answer is a monitored satellite device, whether or not an app sits beside it. Whichever you choose, the procedure still has to say who is alone, who is watching and what happens at the due time plus ten minutes.

What is the best lone worker app in Australia?

There is no single best lone worker app in Australia, because the right one depends on where your people work, how high the risk is and who will answer the alarm. Judge candidates on whether they cover your actual sites and what they do when the signal drops, whether escalation goes to an Australian monitoring centre or to your own on-shift supervisor, whether they run the same on iPhone and Android, what a full shift costs in battery, and whether every check-in and alarm is logged with a timestamp you can export. For remote or no-coverage work no phone app is the answer on its own; a satellite device, a two-way radio or a personal locator beacon has to carry the alarm. Whichever app wins, it still needs a roster beside it that shows who is working alone and who is on shift to receive the alarm.

What is a permit to work?

A permit to work is a written authorisation for one high-risk task, in one location, for a set period, stating the hazards, the controls that must be in place before the work starts, the people responsible and the sign-off that closes it. It is issued by an authorised person after checking the job, and it sits between the risk assessment (the JSA or SWMS) and the work itself. Common types are hot work, confined space entry, working at heights, electrical isolation and excavation permits.

When is a permit to work required?

A confined space entry permit is required by the WHS Regulations before a business directs a worker to enter a confined space. Hot work and working at heights permits are not named in the regulations; they are controls a business adopts to meet its duty to manage fire, explosion and fall risks, and most sites, principal contractors and insurers require them as a condition of work. The site's own permit system decides the triggers, such as a height threshold or any welding near flammables.

Is a confined space entry permit a legal requirement?

Yes. Under the model WHS Regulations, carried in Queensland as regulation 67, a business must not direct a worker to enter a confined space to carry out work unless it has issued a confined space entry permit for that work. The permit must be completed by a competent person, be in writing, and state the space, the names of the people permitted to enter, the period of the work and the risk controls, with space for an acknowledgement that the work is complete and everyone has left. Victoria's OHS law has its own confined space requirements.

What should a working at heights permit include?

A working at heights permit should record the location and height, the work, the fall control chosen and where it sits in the hierarchy (fall prevention device first, then work positioning system, then fall arrest system), the anchor points and the inspection of harnesses, lanyards or the elevating work platform, the exclusion zone below, the weather and wind limit, the rescue plan, and the names and tickets of the competent persons. Where a fall arrest system is used, the regulations require tested rescue procedures, so the rescue plan is not optional on that permit.

Who can issue a permit to work?

A permit is issued by a person the site's permit system authorises to do so, usually a supervisor or permit officer who has been trained in that system, is not the person doing the work, and has checked the job in person before signing. For a confined space entry permit the regulations require the permit to be completed by a competent person, meaning someone with the training, qualification or experience to assess the space and its controls. Most sites keep a list of authorised issuers and a register of every permit they issue.

How long is a permit to work valid for?

A permit is valid only for the period written on it, which on most sites is no longer than one shift. When the crew changes, the work stops for longer than the site allows, or conditions change, such as a new gas reading or a change in the wind, the permit is closed or suspended and the issuer checks the job again before a new permit or a signed revalidation lets work resume. Writing a later expiry time on an existing permit does not extend it.

What is a plant risk assessment?

A plant risk assessment is a written check of one item of plant for one task or stage of its life, such as operation, cleaning or maintenance. It identifies the hazards, rates how likely and how serious the harm could be, records controls chosen from the hierarchy of control, and sets a review date.

What is considered plant under WHS law?

Plant includes any machinery, equipment, appliance, container, implement and tool, any component of them, and anything fitted or connected to them. That covers cranes, excavators, forklifts, scaffolds, generators, power tools and shipping containers. Attachments such as buckets, augers and quick hitches are plant too.

What should a plant register include?

A plant register should include each item's plant ID, description, make, model and serial number, the registration number if it is registered plant, its location and owner or hire company, last inspection and next service dates, the operator licence required, and its status. For registered plant the regulations also require records of all tests, inspections, maintenance and alterations for as long as the plant is used.

What is registered plant?

Registered plant is an item of plant that must be registered with the WHS regulator before it can be used, such as tower cranes, lifts, concrete placing booms, mobile cranes rated over 10 tonnes and higher-hazard boilers and pressure vessels. Schedule 5 of the WHS Regulations lists the items and the plant designs that need registration. Item registration lasts five years, and the registration number must be displayed on the plant.

How often should a plant risk assessment be reviewed?

Whenever something changes, and on a set date in between. The WHS Regulations require controls to be reviewed when they are not working, before a change that could create a new risk, when a new hazard is found, or when a health and safety representative asks. In practice that means new plant, a modification, a new site or task, or an incident.

Does hired plant need a risk assessment?

Yes. The WHS duty applies to a business to the extent it manages or controls plant, in whole or in part, so the business using a hire machine on its site must manage the risks of where and how it is used. The hire company keeps duties for the parts it controls, such as servicing, so ask for its inspection and service records before the machine is unloaded.

What is a site induction?

A site induction is the information, training and instruction a worker is given about one specific workplace before starting work there: the site rules, the hazards and their controls, the emergency plan, who to report to and the permits in use. It is delivered by whoever has management or control of the site, usually the principal contractor, client or site operator, and repeated for every site. It is separate from the White Card and from the employer's own onboarding.

What should a site induction checklist include?

A site induction checklist should cover site rules and access, the emergency plan and first aid, the current site hazards and their controls, the PPE required on that site, the permits and isolations in use, how to report hazards and incidents, communications and prestart arrangements, amenities and fatigue rules, and the tickets and licences sighted for the worker's scope. It ends with a signed declaration from the worker and the inductor, and feeds a register that records the date and renewal date for every person inducted.

Is a White Card the same as a site induction?

No. A White Card proves a worker completed general construction induction training, a national unit done once and recognised in every state. A site induction covers one specific site and is given by the business controlling that site each time a worker starts there. WorkSafe WA states that the general training is not designed to take the place of work site or task specific instruction, so a worker needs both.

Do subcontractors need a site induction?

Yes. The duty to induct belongs to whoever has management or control of the site and covers every person who works there, including subcontractors' crews and labour hire workers. On a Queensland construction project, a person entering a part of the workplace where construction work is being done must have had a site-specific induction or be accompanied by someone who has. A subcontractor inducted on one principal's site is not inducted on the next.

How long is a site induction valid for?

There is no legal expiry on a site induction; the period is set by the site. Twelve months is the common renewal period, with re-induction when something significant changes, such as a new stage, new plant, a new principal contractor or a changed emergency plan, and for a worker returning after months away. A register with a renewal date against each person is what makes renewals visible before they lapse.

Who is responsible for site inductions?

The business with management or control of the site is responsible for delivering and recording site inductions: on a construction project that is the principal contractor, and elsewhere the client or site operator. The worker's own employer, including a labour hire agency or a subcontractor, keeps its own duty to its workers and should hold evidence that each of them was inducted before starting.

What does SWMS stand for?

SWMS stands for safe work method statement. It is a document that sets out the high risk construction work to be carried out, the hazards and risks arising from that work, the measures to control the risks, and how those controls will be implemented, monitored and reviewed. The WHS Regulations in the model-law states and territories, and Victoria's OHS Regulations, require one before high risk construction work starts.

Who is responsible for preparing a SWMS?

The business doing the high risk construction work is responsible for ensuring a SWMS is prepared, or has already been prepared by someone else, before the work starts. In practice the subcontractor prepares it for its own crew, in consultation with the workers who will do the work and their health and safety representatives. On a construction project the principal contractor must take all reasonable steps to obtain a copy before the work starts, but preparing it stays with the business doing the work.

What must a SWMS include?

A SWMS must identify the work that is high risk construction work, state the hazards and the risks to health and safety associated with them, describe the control measures, and describe how those controls will be implemented, monitored and reviewed. It must be prepared taking into account the circumstances at the workplace and, on a construction project, the WHS management plan, and be set out so the people using it can understand it. For work with a fall risk over 2 metres where the only controls are administrative or PPE, it must also describe all the control measures that were considered.

How long do you keep a SWMS?

Keep a SWMS until the high risk construction work it covers is completed. If a notifiable incident occurs in connection with that work, keep it for at least 2 years after the incident. For the whole period it is kept, a copy must be readily accessible to the workers doing the work and available for inspection, and it can be kept electronically. Victoria requires the SWMS to be retained for the duration of the high risk construction work.

What is the difference between a SWMS and a JSA?

A SWMS is the document the law requires before high risk construction work, while a JSA (job safety analysis) is a planning tool for any task that no regulation requires by name. A JSA often sits under a SWMS to carry the day's detail on a particular task, but it cannot replace a SWMS for work on the high risk construction work list. WorkSafe Victoria states plainly that risk assessments and JSAs are not required under legislation but can be useful tools.

Does a SWMS need to be signed?

The regulation does not require a signature by name, but it does require the SWMS to be prepared in consultation with workers and followed by them, and a signed consultation block is the accepted way to show both. WorkSafe Queensland's guidance says a SWMS may include the names of the workers consulted, the date, and each worker's signature acknowledging their participation. Most principal contractors will not accept a SWMS without one, and a sign-on dated before the work started is the evidence that matters after an incident.

How often should you hold a toolbox talk?

As often as the risk changes, which on most field crews means a short daily prestart and a weekly toolbox talk, with an extra talk when a new hazard, a near miss, a new rule or a change of season arrives. No Australian law sets a frequency. SafeWork NSW says consultation must be regular and ongoing, and the record of the talks is what shows it was.

How long should a toolbox talk be?

Five to ten minutes is the convention regulators describe, and up to fifteen if the crew has a lot to say. One topic, three points, one question for the crew, the actions agreed, and the sign-on. A talk that runs past fifteen minutes has usually become a training session, which is a different thing with a different record.

What is the difference between a toolbox talk and a prestart meeting?

A prestart meeting is daily and broad: today's tasks, their hazards, permits, plant, weather, new starters and fit for work, in five to ten minutes before work starts. A toolbox talk is a deeper session on one topic, held regularly or when a risk changes. Many sites use the names interchangeably, and a plant prestart check is a third thing again: the operator's inspection of a machine before use. Outside site safety, a prestart meeting can also mean a council meeting before development works or a home builder's selection appointment, which is not what this guide covers.

What should a toolbox talk record include?

The topic, the date, the presenter, the names and signatures of everyone who attended, the questions or concerns raised, and the actions agreed with a person and a due date on each. Regulators describe the minimum as topics, dates and names attending; the actions and their follow-up are what turn the record into consultation rather than attendance.

What is a traffic management plan?

A traffic management plan is a document that sets out how a workplace keeps people and vehicles apart, covering routes, barriers and exclusion zones, speed limits, loading areas, reversing rules, signage and emergency access. Work on or near a public road needs a different document, the road work zone traffic management plan, which follows the state road authority's rules.

What should a traffic management plan include?

A site traffic management plan should include a current site drawing of vehicle routes, pedestrian walkways and gates, the barriers and exclusion zones that separate people from mobile plant, and speed limits for each area. It should also set out loading and unloading zones, reversing and spotter rules, pedestrian crossings, delivery arrangements, signage, how changes are communicated, emergency vehicle access, and the triggers that reopen the plan.

Who can prepare a traffic management plan?

A site traffic management plan can be prepared by a competent person the business chooses, usually the site manager or supervisor working with the safety adviser. A road work zone traffic management plan or traffic guidance scheme must be prepared by a person holding the qualification the state requires. In NSW that is the SafeWork NSW prepare a work zone traffic management plan training, in Queensland the Transport and Main Roads Traffic Management Design accreditation, and in Western Australia a Main Roads traffic management accreditation.

What is the difference between a traffic management plan and a traffic guidance scheme?

A traffic guidance scheme is one part of a road work zone traffic management plan. The plan covers the whole approach to managing traffic around the work, while the traffic guidance scheme sets out the signs and devices that implementers place on the road.

How often should a site traffic management plan be reviewed?

A site traffic management plan should be reviewed whenever the site changes, with a scheduled review if nothing else has triggered one. Common triggers are a new stage, gate or haul route, new mobile plant, changed delivery hours, night work, a near miss or incident, and a worker raising a problem with a route.

Who approves a traffic management plan on a construction site?

On a construction project the principal contractor approves the site traffic management plan, because it has management or control of the site and sets the site rules in its WHS management plan. The plan either sits inside the WHS management plan or is referenced from it by version number. Subcontractors work to the site plan, and their own JSA or SWMS covers the risks of their task.

What is TRIFR?

TRIFR, the total recordable injury frequency rate, is the number of recordable work injuries per million hours worked. Recordable injuries are fatalities, lost time injuries, restricted work injuries and medical treatment injuries; first aid injuries are excluded. The formula is recordable injuries multiplied by 1,000,000, divided by the hours worked in the same period.

How do you calculate TRIFR?

Add up the fatalities, lost time injuries, restricted work injuries and medical treatment injuries in the period, multiply the total by 1,000,000 and divide by the hours worked in the same period. First aid injuries are left out. Six recordable injuries across 264,960 hours gives a TRIFR of 22.6.

How do you calculate LTIFR?

To calculate LTIFR, the lost time injury frequency rate, multiply the number of lost time injuries in the period by 1,000,000 and divide by the total hours worked in that period. A lost time injury is one where the worker cannot work at least one full day or shift after the day of the injury, and fatalities are counted with them. One lost time injury across 264,960 hours gives an LTIFR of 3.8.

What is a good TRIFR in Australia?

There is no official benchmark. Safe Work Australia publishes workers' compensation claims rates rather than TRIFR, and its national serious claims frequency rate of 6.8 per million hours in 2023-24 counts accepted claims with a week or more off work, so it is not comparable with a contractor's injury-based rate. The useful comparison is your own rate over the last three to five years on the same definitions and hours basis.

What is the difference between TRIFR and LTIFR?

LTIFR counts only injuries that cost at least one full shift, plus fatalities. TRIFR also counts restricted work injuries and medical treatment injuries, where the worker was hurt badly enough to need a doctor or alternate duties but lost no shift. TRIFR is always equal to or higher than LTIFR for the same period, and it is harder to keep low by managing people back to work early.

Do contractor hours count in TRIFR?

It depends on what the client or scheme asks for. Some want employee hours and injuries only, some want everyone working under your control on the site, and some want the two reported separately. Use the definition on the form, state which one you used, and keep contractor hours in the same timesheet records as employee hours so either answer is available.

What does TRFR stand for?

In workplace safety, TRFR stands for total recordable frequency rate, a shorter name for TRIFR, the total recordable injury frequency rate. It counts fatalities, lost time injuries, restricted work injuries and medical treatment injuries, and in Australia it is normally stated per million hours worked. US reports use TRIR, the total recordable incident rate, on a 200,000-hour basis, which gives a figure five times smaller for the same injuries and hours.

What registers does a business need to keep for WHS?

Most Australian businesses need a register of injuries under workers compensation law, a hazardous chemicals register with current safety data sheets if hazardous chemicals are on site, and a record of each notifiable incident kept for at least five years. Electrical equipment used in harsh conditions needs test records, registered plant needs maintenance and inspection records, and a workplace that may contain asbestos needs an asbestos register.

What is an SDS register?

An SDS register is the common name for the hazardous chemicals register, the list of hazardous chemicals at a workplace kept with the current safety data sheet for each one. Under the model WHS Regulations a business must get the current safety data sheet from the manufacturer, importer or supplier when a hazardous chemical is first supplied, and the amended version when it changes. The sheets must be readily accessible to workers who handle the chemical and to emergency service workers likely to be exposed.

What must a register of injuries include?

It depends on the state, because the requirement usually comes from workers compensation law. In NSW each entry records the worker's name, address, age, occupation and industry, the time and date, and the nature and cause of the injury. Victoria adds the exact location, how it happened, witnesses and who made the entry.

How long do you keep test and tag records?

Under the model WHS Regulations, a test record for electrical equipment used in a hostile operating environment is kept until the item is next tested or permanently removed or disposed of. It must show the tester, the date, the outcome and the next test date, and the tag can be the record. Queensland's WHS Regulation does not carry these provisions and Victoria has its own OHS law, so check the local rules there.

Who needs an asbestos register?

The person with management or control of a workplace needs an asbestos register unless the building was constructed after 31 December 2003 and no asbestos has been identified or is likely to be present. Queensland uses an earlier cut-off of 31 December 1989, and domestic premises are excluded. The register records any asbestos identified by a competent person, with the date it was found and its location, type and condition, or states that none was identified.

Other topics

Ready to see Humanz on your own roster?

Free 30-minute walkthrough, we'll use your real crews, sites and shift patterns.